§ 8-2. Building permit—Fees established.
Before issuing any building permit, the building official shall assess and collect a fee, as hereinafter provided:
(1)
Residential—New construction.
a.
General contractor ..... $0.15 per square foot*
b.
Subcontractor ..... $0.10 per square foot*
* The fee is to be rounded to the nearest dollar.
(2)
Commercial—New construction and additions.
a.
General contractor ..... $0.20 per square foot*
b.
Subcontractor: Two percent of the sub-contract up to $30,000.00 and 1/2% for every thousand dollars thereafter
* The fee is to be rounded to the nearest dollar.
(3)
Certificate of occupancy ..... $50.00
(4)
Electrical power permits for construction.
a.
Temporary pole power ..... $0.00
b.
Temporary cut-in on structure ..... $20.00
c.
Permanent power on structure ..... $20.00
(5)
Renovations: Fees based on FMV.
a.
Value up to $10,000.00 ..... $20.00
b.
$10,000.00 or more ..... $2.00 per thousand
c.
Subcontractor: Two percent of the sub-contract up to $30,000.00 and one-half percent for every thousand dollars thereafter
(6)
House moving ..... $50.00, plus renovation permit, if applicable
(7)
Re-inspection.
a.
First ..... $50.00
b.
Second ..... $100.00
c.
Third and subsequent ..... $150.00
The above is imposed when job is not ready for inspection, has failed to meet code requirements, fails to have a municipal number or identifying sign, lock-outs, failure to call for an inspection upon completion of a job, or failure to correct rejections within ten working days of a rejection date, to be paid before work proceeds.
(8)
Special inspections.
After hours at request of contractor ..... $100.00
(9)
Missed Inspection ..... $150.00 Plus possible tear out of construction
(10)
Registration fee.
All contractors and sub-contractors ..... $100.00
Any person who fails to secure a permit prior to beginning work where required by this part shall be subject to a penalty of double the amount of the fixed permit fees as stated in this part.
(Ord. No. 09-35, 6-22-09; Ord. No. 11-29, 5-23-11; Ord. No. 13-02, 1-28-13; Ord. No. 18-79, 12-10-18)