§ 8-2. Building permit—Fees established.  


Latest version.
  • Before issuing any building permit, the building official shall assess and collect a fee, as hereinafter provided:

    (1)

    Residential—New construction.

    a.

    General contractor ..... $0.15 per square foot*

    b.

    Subcontractor ..... $0.10 per square foot*

    * The fee is to be rounded to the nearest dollar.

    (2)

    Commercial—New construction and additions.

    a.

    General contractor ..... $0.20 per square foot*

    b.

    Subcontractor: Two percent of the sub-contract up to $30,000.00 and 1/2% for every thousand dollars thereafter

    * The fee is to be rounded to the nearest dollar.

    (3)

    Certificate of occupancy ..... $50.00

    (4)

    Electrical power permits for construction.

    a.

    Temporary pole power ..... $0.00

    b.

    Temporary cut-in on structure ..... $20.00

    c.

    Permanent power on structure ..... $20.00

    (5)

    Renovations: Fees based on FMV.

    a.

    Value up to $10,000.00 ..... $20.00

    b.

    $10,000.00 or more ..... $2.00 per thousand

    c.

    Subcontractor: Two percent of the sub-contract up to $30,000.00 and one-half percent for every thousand dollars thereafter

    (6)

    House moving ..... $50.00, plus renovation permit, if applicable

    (7)

    Re-inspection.

    a.

    First ..... $50.00

    b.

    Second ..... $100.00

    c.

    Third and subsequent ..... $150.00

    The above is imposed when job is not ready for inspection, has failed to meet code requirements, fails to have a municipal number or identifying sign, lock-outs, failure to call for an inspection upon completion of a job, or failure to correct rejections within ten working days of a rejection date, to be paid before work proceeds.

    (8)

    Special inspections.

    After hours at request of contractor ..... $100.00

    (9)

    Missed Inspection ..... $150.00 Plus possible tear out of construction

    (10)

    Registration fee.

    All contractors and sub-contractors ..... $100.00

    Any person who fails to secure a permit prior to beginning work where required by this part shall be subject to a penalty of double the amount of the fixed permit fees as stated in this part.

(Ord. No. 09-35, 6-22-09; Ord. No. 11-29, 5-23-11; Ord. No. 13-02, 1-28-13; Ord. No. 18-79, 12-10-18)